Your ASHRAE 188 Water Management Plan, done before the deadline.
Facility managers, building engineers, and owners responsible for a water management program — senior living and skilled-nursing operators, hospitals and CAHs, hotels, residential high-rises, and any building with a cooling tower or centralized hot water. If you're in New Jersey you must have a written WMP by Sept 12, 2026 and implement it by Dec 12, 2026 (P.L.2024 c.66 / S2188); if you run a NYC cooling tower you face monthly Legionella testing as of May 7, 2026 (LL159). CMS-certified healthcare facilities have needed a WMP since 2017. The choice today is a $2,995/yr software subscription or a free-but-generic government PDF; this pack is the professional-grade middle.
Deadline window is open now
If you own or operate a covered building, these are statutory dates, not soft targets. New Jersey requires the written plan first, then implementation; New York City's monthly cooling-tower testing is already in effect.
CMS-certified hospitals, critical access hospitals, and long-term care facilities have needed a documented Legionella water management program since 2017. The surveyor memo (QSO-17-30) expired in September 2025, but the requirement flows straight from the infection-control Conditions of Participation — 42 CFR §§482.42, 483.80, and 485.635 — and surveyors still expect to see the program.
Under P.L.2024 c.66 (S2188), hospitals, nursing and assisted-living homes, high-rises with centralized water heaters, hotels of 25+ units, correctional facilities, and any building with a cooling tower, spa, pool, fountain, mister, or humidifier must have a written WMP by September 12, 2026 and implement it by December 12, 2026.
NYC Local Law 159 of 2025 moved cooling-tower Legionella culture testing to at least every 31 days in season, with test dates reported to the Health Department within 5 days. More broadly, ASHRAE 188-2021 applies to essentially any human-occupied commercial, institutional, or multiunit-residential building with a cooling tower or centralized hot water — single-family homes excepted.
Each row is a real obligation, its exact citation (linked to the live source), and the pack document that satisfies it. The seven ASHRAE 188-2021 §6.2 elements are the spine; the CMS, New Jersey, and New York City rows sit on top for the facilities they cover. Note: ANSI/ASHRAE 188-2021 is copyrighted — the pack maps each section to the standard's required elements and cites them, but does not reproduce its normative text. You should hold a licensed copy of the standard.
| Requirement | Citation | Covered by |
|---|---|---|
| Name a water management program team and assign roles/responsibilities for developing and running the program. | ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) | Water Management Plan (ASHRAE 188-2021) |
| Describe every building water system and draw process flow diagrams from water entry to each point of use (potable hot/cold, cooling towers, decorative/therapeutic features). | ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) | Water Management Plan (ASHRAE 188-2021) |
| Analyze where hazardous conditions can occur and identify the control locations (control points) in the system. | ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) | Water Management Plan (ASHRAE 188-2021) |
| Set control measures with numeric control limits (e.g., temperature, disinfectant residual) at each control location, and define how to monitor them. | ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) | Monitoring & Sampling Log Set |
| Define corrective actions and the management (escalation) response taken when a control limit is not met. | ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) | Corrective Action & Management Response Forms |
| Verify the program is being carried out as designed and validate that it actually controls the hazard; document the Legionella-testing decision (§6.2.8). | ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) | Annual Program Review & Validation Checklist |
| Cover system-specific requirements — operating manuals, water features, potable and non-potable systems — in the plan's control measures and monitoring. | ANSI/ASHRAE Standard 188-2021, §7 | Water Management Plan (ASHRAE 188-2021) |
| CMS-certified hospitals, critical access hospitals, and long-term care facilities: maintain a documented Legionella water management program under the infection-control Conditions of Participation. | 42 CFR §482.42, §483.80, §485.635(a)(3)(vi) | Water Management Plan (ASHRAE 188-2021) |
| New Jersey covered buildings: DEVELOP the WMP by Sept 12, 2026 and IMPLEMENT it by Dec 12, 2026; post a public notice on premises; retain all records on site ≥ 5 years. | N.J.S.A. 26:1A-140 (P.L.2024, c.66 / S2188), §6 | New Jersey S2188 Compliance Supplement |
| NYC cooling-tower owners: perform Legionella culture testing at least every 31 days in season, report each test date to DOHMH within 5 days, and keep an annually-certified Maintenance Program & Plan. | NYC Local Law 159 of 2025; 24 RCNY Chapter 8 (cooling towers) | New York City LL159 / LL77 Cooling-Tower Supplement |
Each template field maps to the exact section it satisfies — no generic boilerplate, no guesswork about what an inspector expects.
We read the live regulation text (not a summary) and record the source URL and the date we retrieved it, so you can re-check any claim yourself.
Editable DOCX plus print-ready PDF and a plain-English implementation guide. Fill in the merge fields and it's your document, not a locked SaaS record.
The incumbent water-management software (e.g. HC Info LAMPS at ~$2,995/yr) is genuinely good at ongoing hosted monitoring — that's its core value and our Phase 2 logbook is the honest comparison there. But for the document deliverable a covered facility owes an inspector, a recurring subscription is overkill and a free government PDF is under-built. This pack is the empty middle tier.
| What you need | WMPKit | $2,995/yr software | Free CDC/ASHRAE PDF |
|---|---|---|---|
| Price | $399 one-time | $2,995 / year, recurring | Free |
| Built to ASHRAE 188-2021's 7 required elements (§6.2) | Yes — mapped element-by-element | Yes | Structure described, not filled in |
| Editable files you own (DOCX + PDF) | Yes — keep and reuse forever | No — data locked in the subscription | Generic PDF, not tailored |
| NJ S2188 supplement (Sept/Dec 2026 deadlines, notice, retention) | Included | Add-on / consulting | Not included |
| NYC LL159 supplement (31-day testing, 5-day reporting, MPP) | Included | Add-on / consulting | Not included |
| Every requirement cites its exact rule section + source date | Yes — that is the product | Partial | No |
| Ongoing hosted monitoring / automated sampling reminders | No — Phase 2 logbook add-on (roadmap) | Yes — its core value | No |
A one-time purchase, not another subscription. You own the editable files. Give your water-treatment vendor and engineer a complete draft to refine instead of a blank page — then keep the DOCX for every annual review after.
A complete, editable Water Management Plan built to the seven required elements of ANSI/ASHRAE 188-2021 (§6.2), plus the monitoring logs, corrective-action forms, annual-review checklist, and NJ S2188 + NYC LL159 supplements — mapped section-by-section to the standard.
vs $2,995/yr HC Info LAMPS subscription / generic free CDC PDF for the incumbent