Your ASHRAE 188 Water Management Plan, done before the deadline.

Your ASHRAE 188 Water Management Plan, built on the standard's own seven elements

Facility managers, building engineers, and owners responsible for a water management program — senior living and skilled-nursing operators, hospitals and CAHs, hotels, residential high-rises, and any building with a cooling tower or centralized hot water. If you're in New Jersey you must have a written WMP by Sept 12, 2026 and implement it by Dec 12, 2026 (P.L.2024 c.66 / S2188); if you run a NYC cooling tower you face monthly Legionella testing as of May 7, 2026 (LL159). CMS-certified healthcare facilities have needed a WMP since 2017. The choice today is a $2,995/yr software subscription or a free-but-generic government PDF; this pack is the professional-grade middle.

Deadline window is open now

New Jersey and New York City are counting down

If you own or operate a covered building, these are statutory dates, not soft targets. New Jersey requires the written plan first, then implementation; New York City's monthly cooling-tower testing is already in effect.

38
days left
NJ water management program DEVELOPED (written)
by September 12, 2026 · N.J.S.A. 26:1A-140 §6.a
129
days left
NJ water management program IMPLEMENTED
by December 12, 2026 · N.J.S.A. 26:1A-140 §6.f.1
Now due
deadline passed
NYC 31-day cooling-tower Legionella testing in effect
by May 7, 2026 · NYC LL159 / 24 RCNY Ch. 8

Who needs a Water Management Plan

Healthcare & senior living

CMS-certified hospitals, critical access hospitals, and long-term care facilities have needed a documented Legionella water management program since 2017. The surveyor memo (QSO-17-30) expired in September 2025, but the requirement flows straight from the infection-control Conditions of Participation — 42 CFR §§482.42, 483.80, and 485.635 — and surveyors still expect to see the program.

New Jersey covered buildings

Under P.L.2024 c.66 (S2188), hospitals, nursing and assisted-living homes, high-rises with centralized water heaters, hotels of 25+ units, correctional facilities, and any building with a cooling tower, spa, pool, fountain, mister, or humidifier must have a written WMP by September 12, 2026 and implement it by December 12, 2026.

NYC cooling towers & everyone with a tower

NYC Local Law 159 of 2025 moved cooling-tower Legionella culture testing to at least every 31 days in season, with test dates reported to the Health Department within 5 days. More broadly, ASHRAE 188-2021 applies to essentially any human-occupied commercial, institutional, or multiunit-residential building with a cooling tower or centralized hot water — single-family homes excepted.

What the standard and the laws require — and where it lives in the pack

Each row is a real obligation, its exact citation (linked to the live source), and the pack document that satisfies it. The seven ASHRAE 188-2021 §6.2 elements are the spine; the CMS, New Jersey, and New York City rows sit on top for the facilities they cover. Note: ANSI/ASHRAE 188-2021 is copyrighted — the pack maps each section to the standard's required elements and cites them, but does not reproduce its normative text. You should hold a licensed copy of the standard.

ASHRAE 188-2021 §6.2 elements + CMS / NJ S2188 / NYC LL159 mapped to the WMPKit pack
Requirement Citation Covered by
Name a water management program team and assign roles/responsibilities for developing and running the program. ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) Water Management Plan (ASHRAE 188-2021)
Describe every building water system and draw process flow diagrams from water entry to each point of use (potable hot/cold, cooling towers, decorative/therapeutic features). ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) Water Management Plan (ASHRAE 188-2021)
Analyze where hazardous conditions can occur and identify the control locations (control points) in the system. ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) Water Management Plan (ASHRAE 188-2021)
Set control measures with numeric control limits (e.g., temperature, disinfectant residual) at each control location, and define how to monitor them. ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) Monitoring & Sampling Log Set
Define corrective actions and the management (escalation) response taken when a control limit is not met. ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) Corrective Action & Management Response Forms
Verify the program is being carried out as designed and validate that it actually controls the hazard; document the Legionella-testing decision (§6.2.8). ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) Annual Program Review & Validation Checklist
Cover system-specific requirements — operating manuals, water features, potable and non-potable systems — in the plan's control measures and monitoring. ANSI/ASHRAE Standard 188-2021, §7 Water Management Plan (ASHRAE 188-2021)
CMS-certified hospitals, critical access hospitals, and long-term care facilities: maintain a documented Legionella water management program under the infection-control Conditions of Participation. 42 CFR §482.42, §483.80, §485.635(a)(3)(vi) Water Management Plan (ASHRAE 188-2021)
New Jersey covered buildings: DEVELOP the WMP by Sept 12, 2026 and IMPLEMENT it by Dec 12, 2026; post a public notice on premises; retain all records on site ≥ 5 years. N.J.S.A. 26:1A-140 (P.L.2024, c.66 / S2188), §6 New Jersey S2188 Compliance Supplement
NYC cooling-tower owners: perform Legionella culture testing at least every 31 days in season, report each test date to DOHMH within 5 days, and keep an annually-certified Maintenance Program & Plan. NYC Local Law 159 of 2025; 24 RCNY Chapter 8 (cooling towers) New York City LL159 / LL77 Cooling-Tower Supplement

Built on the regulation itself

Every element cites its rule

Each template field maps to the exact section it satisfies — no generic boilerplate, no guesswork about what an inspector expects.

Sourced and dated

We read the live regulation text (not a summary) and record the source URL and the date we retrieved it, so you can re-check any claim yourself.

You own and edit it

Editable DOCX plus print-ready PDF and a plain-English implementation guide. Fill in the merge fields and it's your document, not a locked SaaS record.

Regulations this pack is built on

  • ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) — General Requirements — §6.2 sets the seven required Water Management Program elements: (1) program team, (2) description of building water systems with process flow diagrams (§6.2.2), (3) hazard analysis / control locations, (4) control measures with control limits, (5) monitoring, (6) corrective/management response, (7) verification and validation; §6.2.8 covers the Legionella-testing decision. ( ANSI/ASHRAE source , read 2026-07-09)
  • ANSI/ASHRAE Standard 188-2021, §7 — Requirements for Building Water Systems — potable and nonpotable system-specific requirements (operating manuals §7.3.6, water features §7.4, etc.) that the plan's control measures and monitoring must cover. ( ANSI/ASHRAE source , read 2026-07-09)
  • ANSI/ASHRAE Standard 188-2021, Normative Appendix A — Health Care Facilities — additional normative water-management requirements for hospitals and other health-care buildings (the 2021 edition renamed the 2018 'Annex A' to 'Appendix A'). ( ANSI/ASHRAE source , read 2026-07-09)
  • CMS QSO-17-30 (S&C 17-30) — EXPIRED 2025-09-02 — Historical surveyor guidance requiring Medicare/Medicaid hospitals, critical access hospitals, and long-term care facilities to develop and implement a Legionella water management program considering ASHRAE 188 and the CDC toolkit. CMS marked this memo EXPIRED on 2025-09-02; the enforceable basis now runs directly through the infection-control Conditions of Participation it cited. ( CMS (Centers for Medicare & Medicaid Services) source , read 2026-07-09) VERIFY
  • 42 CFR §482.42, §483.80, §485.635(a)(3)(vi) — Infection-control Conditions of Participation — the enforceable basis CMS reads as requiring a Legionella water management program: §482.42 (hospitals — sanitary environment + active infection-control program), §483.80 (LTC — infection prevention & control program), and §485.635(a)(3)(vi) (critical access hospitals — system to identify, report, investigate, and control infections). ( CMS / 42 CFR (Conditions of Participation) source , read 2026-07-09)
  • N.J.S.A. 26:1A-140 (P.L.2024, c.66 / S2188), §6 — New Jersey Legionnaires' disease law — owners/operators of covered buildings must DEVELOP a water management program consistent with ASHRAE 188-2018 (or subsequent versions) within 24 months of the 2024-09-12 effective date (= 2026-09-12, §6.a) and IMPLEMENT it within 27 months (= 2026-12-12, §6.f.1); post a public notice on the premises (§6.c); retain the WMP, all procedure/testing records, and implementation documentation on premises at least 5 years (§6.f.2); civil penalties $2,000 / $5,000 / $10,000 (§6.g). ( State of New Jersey source , read 2026-07-09)
  • NYC Local Law 159 of 2025; 24 RCNY Chapter 8 (cooling towers) — New York City cooling-tower Legionella rule — as of 2026-05-07, Legionella culture testing must be performed on every cooling-tower system at least once every 31 days during the operating season (replacing the 90-day interval under LL77); each test date must be reported to DOHMH within 5 days; culture analyses must use a NYS ELAP-certified lab; a Maintenance Program & Plan (MPP) must be kept on site and certified annually. LL159 adds to, and does not replace, Local Law 77 of 2015. ( New York City (DOHMH) source , read 2026-07-09)

Where this sits against the alternatives

The incumbent water-management software (e.g. HC Info LAMPS at ~$2,995/yr) is genuinely good at ongoing hosted monitoring — that's its core value and our Phase 2 logbook is the honest comparison there. But for the document deliverable a covered facility owes an inspector, a recurring subscription is overkill and a free government PDF is under-built. This pack is the empty middle tier.

WMPKit vs. incumbent software vs. free government PDF
What you need WMPKit $2,995/yr software Free CDC/ASHRAE PDF
Price $399 one-time $2,995 / year, recurring Free
Built to ASHRAE 188-2021's 7 required elements (§6.2) Yes — mapped element-by-element Yes Structure described, not filled in
Editable files you own (DOCX + PDF) Yes — keep and reuse forever No — data locked in the subscription Generic PDF, not tailored
NJ S2188 supplement (Sept/Dec 2026 deadlines, notice, retention) Included Add-on / consulting Not included
NYC LL159 supplement (31-day testing, 5-day reporting, MPP) Included Add-on / consulting Not included
Every requirement cites its exact rule section + source date Yes — that is the product Partial No
Ongoing hosted monitoring / automated sampling reminders No — Phase 2 logbook add-on (roadmap) Yes — its core value No

One pack. The whole program.

A one-time purchase, not another subscription. You own the editable files. Give your water-treatment vendor and engineer a complete draft to refine instead of a blank page — then keep the DOCX for every annual review after.

See everything inside the pack →

Frequently asked questions

Which buildings need an ASHRAE 188 Water Management Plan?
ANSI/ASHRAE Standard 188-2021 applies to human-occupied commercial, institutional, multiunit residential, and industrial buildings (single-family homes are excluded). On top of the standard, specific mandates cover you: CMS-certified hospitals, critical access hospitals, and long-term care facilities have needed a WMP since 2017 (42 CFR §§482.42, 483.80, 485.635); all covered New Jersey buildings must have one under P.L.2024 c.66 (S2188); and NYC cooling-tower owners face monthly Legionella testing under Local Law 159 of 2025. If you run a cooling tower or centralized hot water in a hospital, senior-living, hotel, or high-rise setting, this is you.
What's the New Jersey deadline, exactly?
Two dates. Under N.J.S.A. 26:1A-140 (P.L.2024 c.66), covered owners/operators must DEVELOP a written water management program within 24 months of the September 12, 2024 effective date — that's September 12, 2026. They must IMPLEMENT the program within 27 months — December 12, 2026. The plan must exist and be documented before the first date; it must be running before the second. NJ also requires a public-notice posting on the premises and record retention on site for at least 5 years.
What changed for NYC cooling towers in 2026?
Local Law 159 of 2025 (conforming 24 RCNY Chapter 8), effective May 7, 2026, changes Legionella culture testing from every 90 days to at least once every 31 days during the operating season, requires you to report each test date to the Health Department within 5 days, and requires a Maintenance Program & Plan certified annually. LL159 adds to Local Law 77 of 2015 — it does not replace it. The pack's NYC supplement maps the monthly-testing and reporting schedule so you don't miss a 31-day window.
Is the CMS Legionella requirement still in effect if the memo expired?
Yes. CMS marked the QSO-17-30 surveyor memo EXPIRED on September 2, 2025, but the underlying requirement never depended on that memo — it flows from the infection-control Conditions of Participation (42 CFR §482.42 for hospitals, §483.80 for long-term care, and §485.635(a)(3)(vi) for critical access hospitals). Surveyors still expect a documented water management program. We flag the exact current guidance number for you to confirm with your surveyor.
Does this replace a water-treatment professional?
No. This pack gives you a professional-grade WMP structure built to the seven ASHRAE 188-2021 elements, with the logs, forms, and supplements a program needs — so your water-treatment vendor and engineer are refining a complete draft instead of starting from a blank page. A credentialed professional (e.g., a Certified Water Technologist) should still review and validate control limits and sampling for your specific systems. This pack is currently pending that professional review before sale (see the banner).
Do I need to own the ASHRAE 188 standard too?
You should. ANSI/ASHRAE Standard 188-2021 is copyrighted, so this pack maps every template section to the standard's required elements and cites them, but it does not reproduce the standard's normative text. Purchase a licensed copy from the ASHRAE bookstore to have the authoritative requirements alongside your completed plan.